Luggage floor

Time: 2.5 hrs

Things done:

  • Repainted rudder pedal base
  • Riveted supports to luggage floor
  • Installed sound proofing on luggage floor
  • Installed M3 rivnuts in luggage floor for inspection covers

 

img_3177

Had to notice out one of the support so that the rivet for the parachute box will fit

 

img_3176

Looks like it will fit now

img_3175

Yup it fits now

 

img_3178

Sound proofing ll done. I left the backing on the part where some bracket still need to get riveted.

img_3179

Added the left over cut-out onto the back on the inspection covers.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s