Center Fuselage Work

Time: 3.75 hrs

Things done today:

  • Attached seat brackets to ribs 6 (left and right) and 8 (left and right)
  • Clecoed ribs 1 (left and right) to main gear channel
  • Prepped control closing brackets (rib 9 left and right)
  • Main spar ready for priming
  • Clecoed rear spar
  • Cleaned main spar parts (auto pilot mount and control brackets)
  • Prepped luggage support channel (CHL-039)

 

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s