Vertical Stabilizer

Time: 1.75 hrs

Did some deburring of the VS frame parts. Had to also match drill a few rivet holes so the rivets would fit. Additionally I enlarged existing holes (and added a new one) for installing the grommets for the VOR and tail position light wiring.

I notice that there was an undersized hole in the two angle pieces where the rivnuts (7 per piece and I only had 6 holes that would fit the rivnuts) are to be installed. I just had to use the #11 reamer to enlarge the hole that looked like it was sized for a 3.2mm rivet. Still waiting for my rivnut puller so couldn’t install those.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s